Steel stud's saga shows why VA Hospital's delays mount
Washington, DC,
March 19, 2012
They say the devil is in the details. For those mired in Orlando's stalled VA Hospital construction project, thousands of details still need to be hammered out. And the clock is ticking. One of those devilish details — an unassuming 6-inch steel stud — is but one example of what has put the long-awaited medical facility more than 15 months behind schedule.
|